In May 2005 RES Developments Ltd (RES) applied to Dumfries and Galloway Council for consent to construct a wind farm comprising 15 wind turbines on land on Annandale Estate.

The site lies to the immediate east of the Forest of Ae and spans the rolling summits of Minnygap Heights, Bog Shaw and Hangingshaw Hill.

The turbines proposed would have a tubular tower and be three bladed with an overall height to blade tip not exceeding 125m with a nominal rated output of 2000kW (2MW) each. This height has been selected following consultation with relevant authorities who have advised adopting the same dimensions as are being proposed by CRE Energy (a Scottish Power Company) in its application for a significantly larger wind farm within the Forest of Ae. The proposed development will also have associated electricity transformers, access tracks and site entrance, substation compound and control building, up to 2 temporary borrow pits and a wind monitoring mast. Construction of the wind farm should take approximately 12 months. The wind farm would produce enough energy to provide electricity to over 15,500 homes.

This wind farm application was submitted with a full Environmental Statement.

This NTS was produced at the time of the original planning application, and some details may have since changed
Non-Technical Summary (NTS)
of the Environmental Statement (pdf)
86 kb
Figure 1 - Site Location (pdf)
3.0 Mb
Figure 2 - Infrastructure Option A (pdf)
2.0 Mb
Figure 3 - Infrastructure Option B (pdf)
2.0 Mb
Figure 4 - Typical Wind Turbine (pdf)
519 kb
Figure 5 - Viewpoint 11 Map (pdf)
2.5 Mb
Figure 6 - Viewpoint 11 Photomontage (pdf)
1.6 Mb
Download all the files (zip)
10.4 Mb

As part of the public consultation process, a newsletter [384kB] was produced prior to the planning submission and was distributed to approximately 1,000 business and residential addresses within 10km of the site boundary.

Minnygap Newsletter (pdf)
384 kb
Download the file (zip)
341 kb

Information about the Project
line
clear
Installed Capacity:
Number of Turbines:
Turbine Rating:
clear
30 MW
15
2,000 kW



Home | RES Group | Wind Farms | Wind Power | Heat and Power | Beaufort Court | News | Contact Us
  Copyright © 2000 - Renewable Energy Systems Ltd. All rights reserved.   Terms of Use