Proposed Rhos Garn Wind Farm
In June 2005 RES Developments
Ltd (RES) applied to Ceredigion County Council for consent to construct
a wind farm comprising 10 wind turbines on land north of Talgarreg and
south of Mydroilyn.
The turbines proposed would have a tubular tower and be three bladed
with an overall height to blade tip not exceeding 100m with a nominal
rated output of 2000kW (2MW) each.
The proposed development will also
have associated electricity transformers, access tracks and site entrance,
substation compound and control building and a wind monitoring mast.
Construction of the wind farm should take approximately 12 months.
The wind farm would produce enough energy to provide electricity
to over 11,100 homes.
This wind farm application was submitted with a full Environmental
Statement.
Information about the Project

Installed Capacity:
Number of Turbines:
Turbine Rating:
|

20 MW
10
2,000 kW |
|